2 W$ C3 t# X+ r3 ~我的房子在A处,一朋友的房子,用的同一个builder,在B处,就没有用到Traffic Control。Anyway,现在同意了这笔开销,但是出帐单后说只给一个总数,没办法告知我:多少工人、用了多少小时、所用到sign之类的cost等明细,这让我很恼火,还因为“confidential" 的原因不让我直接找Traffic Control (TC)公司。我现在怎么办好么? 谢谢大家! 4 G8 N4 r o w# Y- X0 _' c7 M3 g. o# g \9 ] g1 s, e. a
$ H/ m. E' {; |! p2 N- e& e- X今天他们已经拿到Invoice了,然后打电话给我说要涨到5.5k: 3 P R1 v7 A& ^' W/ e, x - t6 L7 R, M# a- 他们在开始TC之前让我say yes to the TC时候说的是: ! m/ \- `9 R/ f$ M; Z' ^# y; T7 Q“Footing contractors have advised that traffic control will be required due to the proximity to the Klemzig interchange, the street is busy and difficult to access with heavy machinery. . Y$ O* w: d/ }$ y% M4 AWe will require this for a minimum of four days for siteworks.& l* f% T L; O
There will be parking control and traffic direction, plus potentially closure of the street for short periods of time., m! _8 |- M. \1 w) O0 O8 h
The additional cost will be a PC sum of $3,500 which I will raise in a variation shortly. You will receive this via docusign. ”, z U# M @6 X- s3 X
4 c4 F8 Z) L M9 m% p$ y8 ?1 Y
-从上周开始他们切割土、埋管道,到今天灌水泥,我都去看了,数着他们用traffic control (太麻烦了下文就都用TC吧),上周用了3天,加上今天的一天,总共是4天;% v# _ z F. U: z( c